Difference between revisions of "Varrier screens"

From Immersive Visualization Lab Wiki
Jump to: navigation, search
(page setup)
 
(Varrier Screen Calibration)
 
(6 intermediate revisions by one user not shown)
Line 1: Line 1:
Here is where the guide to calibrate the varrier screens should reside.
+
===Varrier Screen Calibration===
 +
 
 +
* Start the Varrier as if you were running the Mars demo:
 +
** wall_on
 +
** RUN_MARS
 +
** Place the cursor in the Mars window
 +
 
 +
* Activate screen isolation and modify color for optimal performance. Use the following key strokes to isolate green/pink so that it completely covers the screen. Look with right eye to optimize pink and left eye for green. Toggle the keys for optimized color.
 +
 
 +
* Keys:
 +
** F9 for the combiner
 +
** Ctrl-Tab for test patters
 +
** Ctrl-Page up/down for screen selection
 +
** Ctrl-Shift left/right angle
 +
** Ctrl-Cursor up/down arrows for optical thickness
 +
** Ctrl-Cursor left/right arrows for shift
 +
 
 +
* Save the configuration: back up the current configuration file at <i>/home/DEMO/evl/varrier/electro-current/config/</i>
 +
 
 +
* Replace the configuration output on the screen with the new configuration file by cutting and pasting in gedit or some other editor.

Latest revision as of 12:08, 15 July 2008

Varrier Screen Calibration

  • Start the Varrier as if you were running the Mars demo:
    • wall_on
    • RUN_MARS
    • Place the cursor in the Mars window
  • Activate screen isolation and modify color for optimal performance. Use the following key strokes to isolate green/pink so that it completely covers the screen. Look with right eye to optimize pink and left eye for green. Toggle the keys for optimized color.
  • Keys:
    • F9 for the combiner
    • Ctrl-Tab for test patters
    • Ctrl-Page up/down for screen selection
    • Ctrl-Shift left/right angle
    • Ctrl-Cursor up/down arrows for optical thickness
    • Ctrl-Cursor left/right arrows for shift
  • Save the configuration: back up the current configuration file at /home/DEMO/evl/varrier/electro-current/config/
  • Replace the configuration output on the screen with the new configuration file by cutting and pasting in gedit or some other editor.