Guide for walk thru
From Immersive Visualization Lab Wiki
- Server Preparation
- Switch inputs to Megapixel
- Use DVI ramp and serial box to initialize each screen
- If issue with first quadrant (miranda) move input into DVI 2 input, from the console run 'init 3' then 'init5'. The miranda light should be green and you can switch the DVI input into the correct port
- run 'xhost +' from the console, this will allow the demo to be solely run from the floor
- Wanda Preparation (controller)
- Connect ethernet cable to tracking PC (test by opening a browser)
- Open serial to usb application and verify the device is idle
- If not disconnect the usb and serial components and plug usb side back in
- Wait until us serial application says idle and then reconnection the serial cable
- hit F12 during POST and select external USB or DVD drive to boot from DVD
- Turn the tracking boxes on (base box first and then top box)
- The top box lights should flash green 2 to 3 times
- Start local tracking service (add name here)
- ssh into megapixel from putty
- start trackd, you should see values coming up on the screen
- if no values or it fails to start "killall -9 trackd"
- repeat start procedure
- ssh into megapixel from putty (second terminal)
- start 'opencover'
- if fails, most likely issue 'xhost +' needs to be set on the server
- 'opencover' can also be run from the control room (e.g directly on megapixel)