GreenLight Blackbox
From Immersive Visualization Lab Wiki
The overall goal is to integrate the new code into the exiting BlackBox code. Steps: 1. Identify where to place the new code, and understanding the existing code. 2. Integrate the code. 3. Testing the interface in the world such as the pulling of the racks and coordinates are preserved and display of power consumption data.Check power consumption display. 4. Add remaining hardware to BlackBox with current configurations. (if time permits)
Documentation: 1. What do new users must need to do to add new hardware in 3dStudioMax. 2. How to add the models into the code.